Excavation in Studio City

Excavation and Grading in Studio City

Studio City is named for the studio lot Mack Sennett began building in 1927, and both the Los Angeles River and the Tujunga Wash run through it. Much of the flat ground is in state-mapped liquefaction zones, and the slopes toward Mulholland Drive are City-designated Hillside Area.

Canyon lots and the haul-route hearing

South of Ventura Boulevard, Fryman and Coldwater canyons climb into the Santa Monica Mountains, and a new house or a large pad on one of those lots can reach the soil volumes that trigger the City’s haul-route process. The applicant submits a proposed route. Public Works and LADOT review it, owners within 300 feet receive notice of a public hearing, and the Board of Building and Safety Commissioners grants, conditions or denies it. A Board decision can be appealed to the City Council. Every one of those steps sits ahead of the grading permit, so export volume is worth settling early, before the house design is fixed.

Checking for a hillside construction district

In March 2023 the City added a Hillside Construction Regulation district covering Franklin Canyon, Coldwater Canyon and Bowmont Hazen. Studio City lots toward Coldwater Canyon Avenue should be checked in ZIMAS for that designation, because it brings limits on work hours, hauling hours and by-right grading. Lots within half a mile of Mulholland Drive also fall under the Mulholland Scenic Parkway Specific Plan, whose area takes in part of the Sherman Oaks–Studio City–Toluca Lake–Cahuenga Pass Community Plan area.

Two rivers across the flats

North of Ventura, the Los Angeles River and the Tujunga Wash both cross the neighborhood, and around half of Studio City is mapped by the state as a liquefaction zone. Around the former Mack Sennett lot, now Radford Studio Center, the streets are flat and the lots are easy to reach, and the soils engineer’s groundwater notes become the main design input. For foundation excavation on the flats, those notes decide how deep footings go and whether the sides need support. On a canyon lot with an existing house, the order is usually demolition and debris haul-off followed by grading the slope in stages.

Nearby areas

Studio City sits between Sherman Oaks to the west and North Hollywood to the north, with the Hollywood Hills over the ridge via Laurel Canyon.

Studio City excavation questions

Do I need a haul route to export soil from a Studio City hillside lot?
You do if the project imports or exports 1,000 cubic yards or more in a hillside grading area. The Board of Building and Safety Commissioners must approve the haul route before LADBS issues the grading permit, and approved routes carry conditions such as trip logs and posted signs.
Why would a soils report for a lot near the river mention liquefaction?
Much of the flat ground along the LA River and Tujunga Wash is in a state liquefaction Zone of Required Investigation. The state draws those zones where historic groundwater was shallower than 40 feet in young, loose sands and silts. For projects the Seismic Hazards Mapping Act covers, a site-specific investigation of the hazard is required before a permit is issued.

Nearby areas we serve

Excavation and grading across the Los Angeles area:

Site visit request

Tell us about the lot

Tell us the address, what you're building and any plans you have. We'll call back to set up a site visit.

  • Access measured at the narrowest point before anything is booked
  • DigAlert ticket and permit needs checked before we dig
  • Soil hauled off in trucks, dust wet down, streets kept clean
  • A written scope before any work starts

Book a site visit

Tell us about the lot. We’ll call you back to set a time.

Or call (213) 319-3620

Got it, thank you.

We'll call to set up a site visit. To talk sooner, call (213) 319-3620