Los Angeles excavation

Demolition and Haul-Off in Los Angeles

Demolition before a dig means breaking concrete and pulling out what's buried: old footings, slabs and driveway. We saw-cut where the plan needs a clean edge, break the rest, keep dust down under the air district's rules, and sort loads so concrete can go to recycling.

What we break out and remove

Much residential demolition in Los Angeles is concrete and small structures: a cracked driveway, a patio slab, a garage floor, a block wall, a shed, or the old foundation left after a house comes down. Where part of a slab stays, the edge is saw-cut first so the break ends on a straight line instead of cracking into the concrete you are keeping. Rebar and wire mesh are cut out with the rubble. Buried pieces, such as an old footing under a lawn, are dug up and removed rather than left for the next excavation to hit.

Permits before anything comes down

Whether a demolition permit is needed depends on what is being removed and which city the property is in, and we confirm it with the building department before work is scheduled. Removing hardscape can also change how water leaves the lot. In Culver City, for instance, an on-site grading permit is triggered whenever flow lines or drainage patterns change, which a large slab removal followed by regrading can do. If the job clears the way for new construction, we sequence the demolition around that project’s permits and inspections.

Dust and track-out under Rule 403

Across the South Coast air district, SCAQMD Rule 403 applies to any activity that can raise dust, and breaking concrete is one of them. Dust may not remain visible beyond the property line, and mud or debris tracked onto the street may not reach 25 feet out and has to be cleaned up at the end of each workday. On a residential job that usually means wetting concrete while it is broken and loaded, covering stockpiles, and sweeping the street and sidewalk before the crew leaves. Larger sites also need gravel pads or wheel washers at every exit.

Sorting the load

Clean concrete, asphalt, soil, wood and green waste go to different places, and mixing them makes every load harder to dispose of. We separate on site where there is room, so concrete and asphalt can go to a recycler and soil to a site that takes it. Truck size is matched to the street and the driveway approach. After an old foundation is out, the hole is either backfilled and compacted or left open for the new work; see foundation excavation. Old pool shells are covered under pool excavation and removal, and a cleared lot often moves straight into rough grading.

What sets the schedule? The amount of concrete and debris, whether a demolition permit is needed, and truck access.

Frequently asked questions

Do I need a demolition permit?
It depends on the structure and the city. We confirm what the building department requires before the job starts.
How do you control dust?
Across the South Coast air district, earthmoving must keep dust from leaving the property and track-out off the street. Water and clean exits are part of the job.

Often part of the same job

These often come up on the same lot, and can be planned from the same site visit:

Site visit request

Tell us about the lot

Tell us the address, what you're building and any plans you have. We'll call back to set up a site visit.

  • Access measured at the narrowest point before anything is booked
  • DigAlert ticket and permit needs checked before we dig
  • Soil hauled off in trucks, dust wet down, streets kept clean
  • A written scope before any work starts

Book a site visit

Tell us about the lot. We’ll call you back to set a time.

Or call (213) 319-3620

Got it, thank you.

We'll call to set up a site visit. To talk sooner, call (213) 319-3620