Excavation in Highland Park & Mount Washington

Excavation and Grading in Highland Park & Mount Washington

Highland Park, in the Arroyo Seco, has the city’s largest Historic Preservation Overlay Zone at about 4,000 structures, and the Raymond Fault’s Alquist-Priolo zone crosses its north side. Neighboring Mount Washington is almost entirely Hillside Area and has had its own specific plan since 1993.

Approvals stack in a set order

A house project inside the Mount Washington/Glassell Park Specific Plan, adopted as Ordinance 168,707 and in effect since May 10, 1993, clears City Planning first. Only after the Director of Planning grants a Project Permit can LADBS issue a building or grading permit, and on a Baseline Hillside Ordinance lot the grading permit also waits for the building permit to clear. Because the Northeast Los Angeles Community Plan area has been in the Hillside Construction Regulation district since July 2023, the job then runs under that district’s hour and hauling limits too. We map that sequence at the start so nobody orders a machine for a permit that is two approvals away.

Digging near protected trees on the hill

The plan’s tree rule shapes how utility lines get routed on Mount Washington’s steep lots. Inside the dripline of a native or significant tree, a trench is dug with hand tools or small hand-held power equipment, not a backhoe. When we plan trenching for water, sewer or electrical lines, we look first for a path that stays outside driplines, and plan the hand-dug stretches as hand work when there is no way around. The same thinking applies to footings for a retaining wall cut into the slope.

Highland Park’s flats and its historic district

Down in the Arroyo Seco, Highland Park is a different job. The Highland Park–Garvanza HPOZ was adopted in 1994 and expanded to Garvanza in 2010, and its review covers exterior work down to the landscaping. On the north side of the neighborhood the state’s Raymond Fault zone adds a separate question for new construction, and about a quarter of Highland Park is mapped by the state as liquefaction zone on lower ground. For an ADU pad in a Craftsman-era backyard, the preservation review and any soils review may both need to be settled before a shovel goes in.

Nearby areas

Across the hills to the north is Eagle Rock, Pasadena sits up the Arroyo Seco, and Silver Lake and Echo Park are southwest past Elysian Valley.

Highland Park & Mount Washington excavation questions

What changes if my lot is in the Mount Washington/Glassell Park Specific Plan?
No building or grading permit is issued for a house project there until City Planning grants a Project Permit, and LADBS reviews grading over 1,000 cubic yards against the City’s Landform Grading Manual. Utility trenches inside the dripline of a protected native or significant tree must be dug with hand tools or small hand-held power equipment.
Does the Highland Park HPOZ affect excavation or site work?
It can. In an HPOZ, all proposed exterior work, including landscaping, alterations, additions and new construction, gets extra review against the district’s preservation plan. That review comes on top of the LADBS permit, so an addition or a new ADU in the district may need HPOZ sign-off.

Nearby areas we serve

Excavation and grading across the Los Angeles area:

Site visit request

Tell us about the lot

Tell us the address, what you're building and any plans you have. We'll call back to set up a site visit.

  • Access measured at the narrowest point before anything is booked
  • DigAlert ticket and permit needs checked before we dig
  • Soil hauled off in trucks, dust wet down, streets kept clean
  • A written scope before any work starts

Book a site visit